mgt421-communucation
- The Assignment must be submitted on Blackboard (WORD format only) via allocated folder.
- Assignments submitted through email will not be accepted.
- Students are advised to make their work clear and well presented, marks may be reduced for poor presentation. This includes filling your information on the cover page.
- Students must mention question number clearly in their answer.
- Late submission will NOT be accepted.
- Avoid plagiarism, the work should be in your own words, copying from students or other resources without proper referencing will result in ZERO marks. No exceptions.
- All answered must be typed using Times New Roman (size 12, double-spaced) font. No pictures containing text will be accepted and will be considered plagiarism).
Submissions
without this cover page will NOT be accepted
You are working as a “Project Manager” in “TAQNIA ROBOTICS AND SMART SYSTEM”, one of 1st Robot and security devices production company in KSA.
The company wants to Participate in a tradeshow “Saudi Robotics Conference & Expo”,14 & 15 January 2020 at King Abdullah Cultural Center, Al Jubail, .
Question – As a Project Manager, prepare a Formal Project Plan for participating in the trade show. Your plan should follow the following order:
- Table of contents.
- Letter for Authorization & transmittal.(01 Grade)
- Executive Summary(01 Grade)
- Overview (01 Grade)
- Conclusions(01 Grade)
Cover page
Instruction–
- Students will find additional useful information from the following link.
- Students has to prepare Formal Project Plan at least 6- 7 Pages Long.
- Students should prepare his/her Formal Project by using specified Format/ Techniques/ Templets that explained in Chapter 10 (short and long report).
and