mgt421-communucation

  • The Assignment must be submitted on Blackboard (WORD format only) via allocated folder.
  • Assignments submitted through email will not be accepted.
  • Students are advised to make their work clear and well presented, marks may be reduced for poor presentation. This includes filling your information on the cover page.
  • Students must mention question number clearly in their answer.
  • Late submission will NOT be accepted.
  • Avoid plagiarism, the work should be in your own words, copying from students or other resources without proper referencing will result in ZERO marks. No exceptions.
  • All answered must be typed using Times New Roman (size 12, double-spaced) font. No pictures containing text will be accepted and will be considered plagiarism).

Submissions
without this cover page will NOT be accepted

You are working as a Project Manager in “TAQNIA ROBOTICS AND SMART SYSTEM”, one of 1st Robot and security devices production company in KSA.

The company wants to Participate in a tradeshow “Saudi Robotics Conference & Expo”,14 & 15 January 2020 at King Abdullah Cultural Center, Al Jubail, .

Question – As a Project Manager, prepare a Formal Project Plan for participating in the trade show. Your plan should follow the following order:

  • Table of contents.
  • Letter for Authorization & transmittal.(01 Grade)
  • Executive Summary(01 Grade)
  • Overview (01 Grade)
  • Conclusions(01 Grade)

Cover page

Instruction–

  • Students will find additional useful information from the following link.
  • Students has to prepare Formal Project Plan at least 6- 7 Pages Long.
  • Students should prepare his/her Formal Project by using specified Format/ Techniques/ Templets that explained in Chapter 10 (short and long report).

and